Project Overview

MechCiv Engineering provided steel detailing services for the Brooklyn Paramount Theater renovation project using specific software. The project involved the meticulous design and detailing of the steel framework for a historic theater, ensuring structural integrity while preserving the building’s architectural heritage. Our work included creating detailed 3D models, fabrication drawings, and connection designs to support the theater’s renovation and modernization.

Challenges

⇒ Historic Preservation: The project required preserving the historic elements of the theater while integrating new steel structures. Balancing modern structural requirements with the preservation of the building’s historical features was a significant challenge.

⇒ Complex Structural Adaptations: The theater’s design required adapting the steel structure to fit within the existing framework, which included dealing with irregular shapes and outdated structural components. Accurate detailing was necessary to ensure the new elements fit seamlessly.

⇒ Integration with Existing Systems: Coordinating the new steel structure with existing systems, such as lighting, acoustics, and rigging, posed challenges in terms of alignment and avoiding conflicts with the theater’s complex layout.

Solutions

⇒ Advanced Modeling for Preservation: We used software’s advanced modeling tools to integrate the new steel structures with the existing historical elements. This allowed us to design modern reinforcements while respecting the theater’s architectural heritage.

⇒ Detailed Structural Analysis: We performed comprehensive structural analysis and modeling to adapt the steel framework to the existing irregularities. Software’s capabilities enabled us to create precise and accurate designs that fit within the existing structure and addressed any inconsistencies.

⇒ Coordinated Clash Detection: Software’s clash detection features were utilized to identify and resolve conflicts between the new steel structure and existing systems. Regular coordination meetings with other trades helped ensure that all elements were integrated smoothly and efficiently.

The project was successfully completed with the Brooklyn Paramount Theater receiving a modernized steel framework that supported its renovation while honoring its historical significance. MechCiv Engineering’s expertise in effective problem-solving ensured a successful and respectful renovation of this iconic theater.

Area

72000 sq.ft.

Project Duration

1.5 Year

Location

United States